German website
The 1 GW photovoltaic plant and corresponding 600 MWh battery storage system are located in the Egyptian desert – a harsh environment that presents unique engineering and operational challenges.
Plans for an electricity connection between Greece and Egypt are moving forward. It is to be used for the transportation of solar and wind power.
In the run-up to Intersolar Europe, the latest market report on the solarisation of the sunniest continent was published. It analyses the development of the photovoltaic markets, the prospects and the risks.
Sungrow announced that a 100 MW retrofit PV project with 1500Vdc central inverter solutions has been operational for 12 months in Benban Solar Park, Egypt. Reportedly the largest retrofit PV undertaking in the MENA region, the project boosts the performance of the existing asset for customers.
Sungrow announced recently it forged the contract to supply equipment to juwi for the 36 megawatt off-grid solar farm and a 7.5 megawatt battery energy storage system at Sukari gold mine operated by Centamin in Egypt.
Sungrow signed an inverter supply contract for the 200 MW Kom Ombo project in Egypt, located within a desert area of Kom Ombo town in the Aswan Governorate of the Arab Republic of Egypt.
The 36-megawatt solar farm and 7.5-megawatt battery storage system will be integrated into existing diesel power plant at Sukari Gold Mine.
SunBrush mobil and Infinity have opened a service base for PV cleaning equipment at Benban/Egypt, Africa's largest solar park.