Skip to main content Skip to main navigation Skip to site search
  • Home
  • All articles of topic construction

All articles of topic construction

When the grid takes a tea break, mobile storage steps in with fast-charging certainty

Allye’s MAX500 brings DC fast charging to off-grid construction

-

The deployment of next-generation battery systems highlights how construction sites are adapting to grid bottlenecks and emissions targets.

 The Illora solar park of Baywa r.e. is located in Pinos Puente near Granada. It consists of three plant sections with a total capacity of 147.6 megawatts.
Investments

Recurrent Energy secures up to €1.3 billion for EU projects

-

Developer Recurrent Energy, a subsidiary of Canadian Solar, is looking to expand its European portfolio of solar parks and battery storage projects. New financing from ten banks will enable the construction of projects in Spain, Italy, the UK, the Netherlands, France and Germany.

 Ohio has green-lit what will be the state’s largest solar farm – and the largest agrivoltaics project in the US.
Biodiversity

Ohio solar farm to become largest agri-PV project in the US

-

The 1-billion-dollar Oak Run Solar Project, approved by the Ohio Power Siting Board last week, will sit on over 6,000 acres in Madison County, west of Columbus, Ohio in the United States.

Handling

Solar lifter now with even more improvements

-

The most important new feature of the Flipper construction lift is an additional wireless remote control. This now makes it possible to control the lift from the ground. However, there is still a fixed remote control if necessary.

The integration of a solar function into existing building products, as here in metal elements by Zambelli, is a path taken by manufacturers of organic solar films, among others.
Trade fair

Sustainable buildings as a focus of this year’s BAU in Munich

-

At this year's leading trade fair for the construction industry and architecture in Munich, solar energy concepts are one of the focal points. Because sustainability is also important in the operation of buildings.

Solar parks

Belectric builds solar park on ash-filled open-cast mine hole

-

The planner from Kolitzheim ventures into difficult terrain. This is because LEAG's new solar park is being built on an ash settling pit, which poses a structural challenge.

Five projects in California and Texas are under construction and will soon be powering the cumulative equivalent of 357,000 homes.
Tracking systems:

Nextracker’s trackers and software to be deployed by Signal Energy in the US

-

Two large solar projects in Texas and California to be supplied with trackers and yield optimization software from Nextracker.

Chile sees a solar boom, especially of large-scale solar parks.
Latin America:

Construction of 160 MW solar plant in Chile starts

-

Sonnedix announced the start of construction of Sonnedix Meseta de los Andes, a 160 MW solar PV plant located in the commune of Calle Larga, in central Chile’s Valparaiso region.