The report finds that cross-border trade in the day-ahead market alone generates around EUR 32 billion in economic surplus each year. Yet an assessment of 13 selected integration projects suggests total economic surplus gains of approximately EUR 7 billion for 2025, if all projects were already fully operational. Projects implemented by the end of 2025 generated around EUR 3 billion, while delays in implementation cost roughly EUR 700 million in unrealised surplus in 2025 alone and about EUR 8 billion cumulatively between 2020 and 2025. A further EUR 4 billion would be unlocked if all 13 projects were operational.
Renewables, PPAs and the cannibalisation problem
For the solar sector, the report's most pointed findings concern capture rates and the design of support schemes. Across the EU, solar capture rates have generally been declining, pointing to increasing cannibalisation effects, while wind capture rates have remained comparatively more stable because wind generation follows more diverse temporal patterns and is less concentrated within a limited set of daylight hours.
In Amsterdam, RE-Source 2026 catches the PPA market mid-rethink
ACER sees hybrid contracts as part of the answer. Arrangements combining renewable generation with storage can mitigate the cannibalisation effect by shifting output into higher-priced hours, and by offering off-takers greater protection against price peaks they can strengthen developers' negotiating position and result in PPAs settled at higher prices. Market data appears to confirm the trend: investors are responding by combining renewable investments with flexible assets and packaging both into flexible contractual arrangements, including hybrid PPAs.
The agency is equally clear on the risks of badly designed public support. Where support payments are linked to production and continue during negative-price periods, producers may still benefit from generating despite the negative market price, which can aggravate negative-price episodes and increase both system and support costs. France, ACER notes, has begun to adapt legacy contracts so that supported producers curtail during negative-price periods without losing remuneration for the production foregone.
Negative prices, curtailment and the 15-minute shift
The structural shift in day-ahead price formation is striking. The average daily spread between minimum and maximum day-ahead prices increased from 28.3 EUR/MWh in 2020 to 133 EUR/MWh in 2025, almost five times the 2020 level. And despite negative prices, significant volumes of solar and wind generation continued to be produced while day-ahead prices were negative, meaning these volumes were not curtailed, or not fully curtailed, in response to the negative price signal.
One of the year's most consequential changes is the move to quarter-hourly trading. Since delivery day 1 October 2025, the Single Day-Ahead Coupling has operated with 15-minute market time units, allowing prices and traded volumes to be determined separately for each quarter-hour. Uptake has been rapid, with 15-minute products already dominating traded volumes, although the transition was accompanied by significant intra-hourly price volatility, often referred to as a "sawtooth pattern".
Congestion costs climb, voltage problems spread
Grid congestion is becoming a defining constraint. In 2025, the volume of all costly remedial actions activated in the EU reached 70 TWh, with the costs totalling EUR 5.4 billion, the highest levels in the historical series. Renewables are bearing part of the cost: in Spain and Germany, grid congestion forced curtailment of roughly 3 percent and 2.5 percent of total renewable output respectively.
Hybrid parks: why PV and wind rarely share a single connection
The nature of the problem is also shifting. The share of redispatching attributed to voltage limits has increased from 10 percent in 2022 to 33 percent in 2025. ACER links this partly to the Iberian blackout of 28 April 2025, after which the Spanish TSO began committing more synchronous generation outside the day-ahead market, pushing the total cost of congestion management in Spain to EUR 2.3 billion in 2025, up from EUR 1.2 billion in 2024.
Balancing: integration pays off, but gaps remain
On balancing, the picture is more encouraging. By the end of 2024, TSOs from seven Member States were connected to PICASSO; in 2025, nine additional TSOs connected and the Italian TSO reconnected. The impact on price stability has been dramatic: in Czechia, the annualised duration of extreme aFRR price incidents fell from 26.3 hours in 2024 to 7.0 hours in 2025 and 1.8 hours in 2026.
Regional cooperation on balancing capacity is also delivering. ACER estimates benefits of EUR 146.2 million in 2025 from the FCR Cooperation covering nine countries, alongside substantial gains from the ALPACA, Baltic and Nordic arrangements. New entrants are reshaping these markets: in Belgium, the entry of batteries into the aFRR capacity market coincided with a sharp fall in procurement prices, while in the Baltics, market concentration declined across all four balancing-capacity products between October 2025 and June 2026.
The minimum 70 percent rule, still unmet
Perhaps the most persistent frustration is the slow implementation of the Electricity Regulation's requirement that TSOs make at least 70 percent of transmission capacity available for cross-zonal trade. As of 2026, national action plans are no longer in place, following the expiry of the transitional period at the end of 2025, and the 70 percent minimum becomes the generally applicable requirement.
Opinion: storage is graduating to active grid support
In practice, derogations continue to erode the rule. In the Core region, derogations deduct forecasted loop flows above an acceptable threshold from the 70 percent requirement, on the grounds that the origin of the flows lies outside the affected TSO's control area. Coordinated congestion management processes that might fix the underlying problem are not expected before 2030.
Looking ahead
ACER's conclusions are blunt. Market integration is delivering clear benefits, but the job is not finished; important elements of the target model remain incomplete, and if fully implemented, 13 projects could have generated up to EUR 7 billion in economic surplus gains in 2025. For renewable investors watching from Amsterdam, the message is twofold: short-term markets are maturing fast enough to reward flexibility, but structural bottlenecks, from loop flows to intraday capacity allocation, continue to leave money on the table. (hcn)